In my mind, average mapper (with engineering degree or not, someone who don't want get busy with hard & specialized technical stuff) only see the line.<br><br>The line is the base concept of all the rest. It support tags and circuits relations. It can has 1 or several conductors, that's not the point at first sight.<br>
It's the simplest to map too : you put a way with power=line, nodes with power=tower or pole and that's it.<br>Someone who wants to go deeper with concepts can add some extra tags and spend extra hours to design substation material at its discretion.<br>
<br>If we let users choose the right tag to use, the underlying question of this thread won't be answered at all, that's my fear.<br><br>If we look at power=line vs power=cable, there are only 838 ways tagged as cable against 184 554 ways described as power=line.<br>
<a href="http://wiki.openstreetmap.org/wiki/Tag:power%3Dcable">http://wiki.openstreetmap.org/wiki/Tag:power%3Dcable</a><br><br>Correct the wiki will be harder than migrate all these 838 ways to power=line + location=underground.<br>
<br><br><div class="gmail_quote">2013/1/15 Volker Schmidt <span dir="ltr"><<a href="mailto:voschix@gmail.com" target="_blank">voschix@gmail.com</a>></span><br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
Just to be sure, I have consulted my professional electrical engineer colleagues. <br>We agree that there is some space for ambiguity.<br>When one (overground) power line (which is composed of several conductors) goes underground, the power line continues as one or several underground cables, depending on the technical implementation. High-power lines are always implemented underground as several cables with every cable carrying one conductor, as seems to be shown in the example picture <br>

<a href="https://lh3.ggpht.com/-CnkQkGiPmbs/UFM6M2N0lUI/AAAAAAAAArk/IMZxA3i6SmY/s1600/tunnel.png" target="_blank">https://lh3.ggpht.com/-CnkQkGiPmbs/UFM6M2N0lUI/AAAAAAAAArk/IMZxA3i6SmY/s1600/tunnel.png</a><br><br>My conclusion: I would simply suggest to accept both power=line and power=cable as equivalent. The average mapper is not an electrical engineer after all.<span class="HOEnZb"><font color="#888888"><br>

<br>Volker</font></span><br></blockquote></div><br><br clear="all"><br>-- <br><b>François Lacombe</b><br><br>francois dot lacombe At telecom-bretagne dot eu<br><a href="http://www.infos-reseaux.com" target="_blank">http://www.infos-reseaux.com</a><br>