<div dir="ltr"><div><div><div><div><div>Hi,<br><br></div>The power transmission proposal is now ready for vote.<br>It opens now and will normally be closed November 1.<br><br><a href="http://wiki.openstreetmap.org/wiki/Proposed_features/Power_transmission_refinement">http://wiki.openstreetmap.org/wiki/Proposed_features/Power_transmission_refinement</a><br>
<br></div>Here is a summery :<br></div>- It improves power lines tagging and prepares for power routing introduction.<br></div>- It introduces transition between underground and overground on poles/tower.<br></div><div>- It extends gas_insulation from substation refinement proposal and adds neutral and ground conductors on power lines.<br>
</div><div><br></div><div>Most of this content is advanced mapping and optional, basic mapping is given at the top of the page.<br></div><div><div><div><div><div>Example are here to show how it goes.<br><br></div><div>Thank you in advance for constructive feedback.<br>
<br></div><div><br clear="all"></div><div><div><div><b>François Lacombe</b><br><br>francois dot lacombe At telecom-bretagne dot eu<br><a href="http://www.infos-reseaux.com" target="_blank">http://www.infos-reseaux.com</a><br>
</div>
</div></div></div></div></div></div></div>