<div dir="ltr"><br><div class="gmail_quote"><div dir="ltr">On Sun, 28 Oct 2018 at 10:14, Joseph Eisenberg <<a href="mailto:joseph.eisenberg@gmail.com">joseph.eisenberg@gmail.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="auto"><br></div><div dir="auto"><span style="color:rgb(49,49,49);word-spacing:1px;background-color:rgb(255,255,255)">Mobile or temporary construction cranes are not supposed to be mapped.</span></div></blockquote><div><br></div><div>When we see cranes on high-rise construction sites eg <span style="font-family:arial,sans-serif"><a href="https://goo.gl/images/FWTDo1">https://goo.gl/images/FWTDo1</a>, they can be in place, moving higher up the building as work progresses, for a year or 2. </span></div><div><br></div><div>Couldn't they be mapped, perhaps with a Fix Me, to remove the crane tag when work is completed? (Although, of course, at that stage, the construction tag should be replaced by the appropriate building= tag)</div><div><br></div><div>Thanks</div><div><br></div><div>Graeme</div></div></div>