<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
</head>
<body text="#000000" bgcolor="#FFFFFF">
<div class="moz-cite-prefix">On 16/04/19 13:44, Andrew Harvey wrote:<br>
</div>
<blockquote type="cite"
cite="mid:CAD5VjstRLZB+ZqUPDBs7GF-30rs+WCUFBPsvO1cJRv36nrA0eA@mail.gmail.com">
<meta http-equiv="content-type" content="text/html; charset=utf-8">
<div dir="ltr">
<div>On Tue, 16 Apr 2019 at 11:05, Warin <<a
href="mailto:61sundowner@gmail.com" moz-do-not-send="true">61sundowner@gmail.com</a>>
wrote:<br>
</div>
<div class="gmail_quote">
<blockquote class="gmail_quote" style="margin:0px 0px 0px
0.8ex;border-left:1px solid
rgb(204,204,204);padding-left:1ex">
<div bgcolor="#FFFFFF">
<div class="gmail-m_-617551311766087441moz-cite-prefix">This
one failed - unordered gap. I have repaired it.. good
enough to be usable. <br>
</div>
<br>
Possibly the trains will not change to the other platform
at Tallawong where they terminate, but for the moment in
OSM they do. This will become clear when they start
operating. <br>
</div>
</blockquote>
<div> </div>
<div>Thanks Warin. Yes I was unsure exactly which platform
will be used at Tallawong too. We can wait and see, but
likely both will be used. </div>
</div>
</div>
</blockquote>
<br>
Yes, probably both depending on if it is a termination and restart
or a new train from the yard. Similar problems exist at Central for
country trains... <br>
<br>
<blockquote type="cite"
cite="mid:CAD5VjstRLZB+ZqUPDBs7GF-30rs+WCUFBPsvO1cJRv36nrA0eA@mail.gmail.com">
<div dir="ltr">
<div class="gmail_quote">
<div> The PT schema doesn't like multiple options for the
route, it wants a single continuous route, so not sure the
best approach...<br>
</div>
</div>
</div>
</blockquote>
<br>
Not too fussed myself. It should be good enough to guide people, the
platform announcements and displays should work from there on.
</body>
</html>