<div dir="ltr"><div dir="ltr">1. In terms of validation, it would be helpful to have a clear idea of what sorts of problems need to be fixed.  I have re-validated almost all of the areas I imported (and all of them in Central Toronto), and fixed all of the building related errors/warnings I found (with a few exceptions) there weren't many errors, and many pre-dated the import.  The only JOSM warning I didn't fix is "Crossing building/residential area".  Yaro's and John's areas don't seem to have many errors either, although there a few isolated "Crossing building/highway" warnings (and some "building duplicated nodes" errors).  I have also split big retail buildings in dense areas.<div>2. I'm fine with simplification, I think we should just do it.  In terms of orthogonalization, I don't understand why non-orthogonal buildings are a problem.  If they are, JOSM allows them to be auto-fixed.<br><div>3. I agree that the task manager squares are too big in central Toronto.  A separate task can be created for central Toronto only, with smaller squares.  I think the square size is fine outside of Toronto, as long as the squares are split appropriately.</div><div>4. In terms of conflation, I agree that deleting and re-adding buildings is not desirable, but I don't agree that that means it should never be done, no matter the time cost.  The ideal solution here is some sort of script/plugin that auto-merges new and recently added buildings - basically, an iterated "replace geometry".</div></div><div>DannyMcD</div></div><div class="gmail_quote"><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><br>
</blockquote></div></div>