<div dir="ltr">Hi Andy<div><br></div><div style>Presumably this is for routing engines?  I'm torn as to whether this is the right approach. We didn't do this for the Midlands Metro when it was shut for construction upgrading work for 2 weeks. The tunnel work is  not really construction it's more maintenance of an existing structure. Typically we use the tag for new roads under construction. We could put a barrier=block on each end of the tunnel and change the name of the way by adding (closed for maintenance- reopens on xxx). I'm just worried that we get an edit war with well-meaning mappers changing it back, even if it's commented with a note.  But if the consensus is to use highway=construction then that's fine with me</div>
<div style><br></div><div style>Regards</div><div style><br></div><div style>Brian</div></div><div class="gmail_extra"><br><br><div class="gmail_quote">On 24 April 2013 09:46, Andy Robinson <span dir="ltr"><<a href="mailto:ajrlists@gmail.com" target="_blank">ajrlists@gmail.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Suggest we change tags to highway=construction during each period when the<br>
various city centre tunnels are closed by BCC/Amey for refurbishment.<br>
<br>
<a href="http://www.amey.co.uk/brumtunnels.aspx" target="_blank">http://www.amey.co.uk/brumtunnels.aspx</a><br>
<br>
Cheers<br>
Andy<br>
<br>
<br>
_______________________________________________<br>
Talk-gb-westmidlands mailing list<br>
<a href="mailto:Talk-gb-westmidlands@openstreetmap.org">Talk-gb-westmidlands@openstreetmap.org</a><br>
<a href="http://lists.openstreetmap.org/listinfo/talk-gb-westmidlands" target="_blank">http://lists.openstreetmap.org/listinfo/talk-gb-westmidlands</a><br>
</blockquote></div><br></div>