<p>on the a46 dualling I have been putting the reduced limits in, but here the road is on a new alignment so its for the rest of the life of the road (until is becomes part of ncn route 48 anyway!) . </p>
<p>Shame there's no way AFAIK of tagging fixme:2013-05-01=roadworks due to finish, resurvey alignment/maxspeed<br>
and then have openstreet bugs ignore until that date (unless you wish to see them)!</p>
<p><blockquote type="cite">On 29 Jul 2011 10:13, "Brian Prangle" <<a href="mailto:bprangle@gmail.com">bprangle@gmail.com</a>> wrote:<br><br>The M1 between junctions 11 and 13 is a standard 70 mph NSL, but until spring 2013 it is a 50mph average speed camera regulated section during upgrade works. After Spring 2013 it will become maxspeed=signals. How to tag it? My preference would be for the 50mph average speed with a note that it ends spring 2013. My guess is that sections rolling from the South will transform from 50 mph to maxspeed=signals, so those of you who travel this section of the M1 should watch out for the big switch on and edit appropriately - it will certainly make life swifter than the current congestion.<div>
<br></div><div>As a general point do routing and travel planner algorithms make use of these long term construction speed restrictions?<br><div><br></div><div>Regards</div><div><br></div><font color="#888888"><div>Brian</div>
</font></div>
<br>_______________________________________________<br>
Talk-GB mailing list<br>
<a href="mailto:Talk-GB@openstreetmap.org">Talk-GB@openstreetmap.org</a><br>
<a href="http://lists.openstreetmap.org/listinfo/talk-gb" target="_blank">http://lists.openstreetmap.org/listinfo/talk-gb</a><br>
<br></blockquote></p>