<div dir="ltr">I have featured a bit of HS2 in today's OSMUK Insta posting.... <a href="https://www.instagram.com/p/B_P2HmGnGsi/">https://www.instagram.com/p/B_P2HmGnGsi/</a></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Fri, Apr 17, 2020 at 3:22 PM Brian Prangle <<a href="mailto:bprangle@gmail.com">bprangle@gmail.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="ltr"><div>Hi Andy</div><div><br></div><div>I think maybe a bit premature to make the change you've suggested. OK to convert parcels of land to landuse-=construction as and when HS2 activity gets going - even if its only demolition.</div><div><br></div><div>Regards</div><div><br></div><div>Brian<br></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Fri, 17 Apr 2020 at 11:48, Andy Robinson <<a href="mailto:ajrlists@gmail.com" target="_blank">ajrlists@gmail.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div lang="EN-GB"><div><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Tony, thus far all the construction activity has been and is enabling works. That is mostly related to relocating utilities (especially the major ones), site clearances and the establishment of the working compounds. Many of these have already in full or in part been mapped into OSM. As yet they haven’t mostly been fencing off the main line route. I expect we will see that happen soon for the over land sections. In London not much change will be visible beyond the current clearances and site compound set-ups. The shafts and portals for the main tunnels will be about the only obvious new work in the future outside of the station developments. The construction of the stations themselves is not yet confirmed.<u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)"><u></u> <u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Cheers<u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Andy<u></u><u></u></span></p><p class="MsoNormal"><a name="m_-5841137743930680217_m_-6827703222731224040__MailEndCompose"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)"><u></u> <u></u></span></a></p><div><div style="border-color:rgb(181,196,223) currentcolor currentcolor;border-style:solid none none;border-width:1pt medium medium;padding:3pt 0cm 0cm"><p class="MsoNormal"><b><span style="font-size:10pt;font-family:Tahoma,sans-serif" lang="EN-US">From:</span></b><span style="font-size:10pt;font-family:Tahoma,sans-serif" lang="EN-US"> Tony OSM [mailto:<a href="mailto:tonyosm9@gmail.com" target="_blank">tonyosm9@gmail.com</a>] <br><b>Sent:</b> 17 April 2020 10:02<br><b>To:</b> <a href="mailto:talk-gb@openstreetmap.org" target="_blank">talk-gb@openstreetmap.org</a><br><b>Subject:</b> Re: [Talk-GB] HS2 Phase 1 Construction NTP<u></u><u></u></span></p></div></div><p class="MsoNormal"><u></u> <u></u></p><p>we've seen news reports of parts of the alignment fenced off and invaded by protestors - those parts are certainly under construction, and the pictures show that bulldozers have been active. I think if we can identify those areas then construction is now correct.<u></u><u></u></p><p>Tony Shield<u></u><u></u></p><p>TonyS999<u></u><u></u></p><div><p class="MsoNormal">On 17/04/2020 09:14, Andy Robinson wrote:<u></u><u></u></p></div><blockquote style="margin-top:5pt;margin-bottom:5pt"><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Jez, I think the actual rails may be a long way off but I agree it’s an opportunity to stay ahead of the completion.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">A question for the whole list. How do folks feel about changing the Phase 1 route from rail=proposed to rail=construction. Perhaps it’s a bit premature but then perhaps not.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Cheers</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)">Andy</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,sans-serif;color:rgb(31,73,125)"> </span><u></u><u></u></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:Tahoma,sans-serif" lang="EN-US">From:</span></b><span style="font-size:10pt;font-family:Tahoma,sans-serif" lang="EN-US"> Jez Nicholson [<a href="mailto:jez.nicholson@gmail.com" target="_blank">mailto:jez.nicholson@gmail.com</a>] <br><b>Sent:</b> 16 April 2020 22:15<br><b>To:</b> Andy Robinson<br><b>Cc:</b> Talk-GB<br><b>Subject:</b> Re: [Talk-GB] HS2 Phase 1 Construction NTP</span><u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><div><p class="MsoNormal">Thanks Andy, this is opportunity for OSM to be *the* best source of HS2 rails data.<u></u><u></u></p></div><p class="MsoNormal"> <u></u><u></u></p><div><div><p class="MsoNormal">On Wed, 15 Apr 2020, 17:48 Andy Robinson, <<a href="mailto:ajrlists@gmail.com" target="_blank">ajrlists@gmail.com</a>> wrote:<u></u><u></u></p></div><blockquote style="border-color:currentcolor currentcolor currentcolor rgb(204,204,204);border-style:none none none solid;border-width:medium medium medium 1pt;padding:0cm 0cm 0cm 6pt;margin:5pt 0cm 5pt 4.8pt"><div><div><p class="MsoNormal">Government issued Notice to Procced for Phase 1 today, which means the main contracts construction between London and Birmingham will start imminently so keep an eye out for major new works in your area soon (though I expect these will be slow to spot while we are in lockdown!)<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">Till now all works relating to HS2 have been enabling works or design related.<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">Cheers<u></u><u></u></p><p class="MsoNormal">Andy<u></u><u></u></p></div></div><p class="MsoNormal">_______________________________________________<br>Talk-GB mailing list<br><a href="mailto:Talk-GB@openstreetmap.org" target="_blank">Talk-GB@openstreetmap.org</a><br><a href="https://lists.openstreetmap.org/listinfo/talk-gb" target="_blank">https://lists.openstreetmap.org/listinfo/talk-gb</a><u></u><u></u></p></blockquote></div><p class="MsoNormal"><br><br><u></u><u></u></p><pre>_______________________________________________<u></u><u></u></pre><pre>Talk-GB mailing list<u></u><u></u></pre><pre><a href="mailto:Talk-GB@openstreetmap.org" target="_blank">Talk-GB@openstreetmap.org</a><u></u><u></u></pre><pre><a href="https://lists.openstreetmap.org/listinfo/talk-gb" target="_blank">https://lists.openstreetmap.org/listinfo/talk-gb</a><u></u><u></u></pre></blockquote></div></div>_______________________________________________<br>
Talk-GB mailing list<br>
<a href="mailto:Talk-GB@openstreetmap.org" target="_blank">Talk-GB@openstreetmap.org</a><br>
<a href="https://lists.openstreetmap.org/listinfo/talk-gb" rel="noreferrer" target="_blank">https://lists.openstreetmap.org/listinfo/talk-gb</a><br>
</blockquote></div>
_______________________________________________<br>
Talk-GB mailing list<br>
<a href="mailto:Talk-GB@openstreetmap.org" target="_blank">Talk-GB@openstreetmap.org</a><br>
<a href="https://lists.openstreetmap.org/listinfo/talk-gb" rel="noreferrer" target="_blank">https://lists.openstreetmap.org/listinfo/talk-gb</a><br>
</blockquote></div>