am hoping too on the the opening soon of Munoz station, walking distance from my place, where I can see the slow progress everyday<br>the lrt construction and the concrete re-blocking of EDSA Munoz up to Trinoma are causing traffic jams even at 12 midnight<br>
<br>my alternate route to Makati via Araneta avenue is also doing re-blocking work...i don't know if it's something like midnight construction or just the usual Pinoy construction during the rainy days<br><br>the station in front of SM north and trinoma is going to take some time since they're considering a re-design due to the integration of the planned MRT line to San Jose del Monte<br>
<br><div class="gmail_quote">On Fri, Jun 4, 2010 at 7:20 PM, maning sambale <span dir="ltr"><<a href="mailto:emmanuel.sambale@gmail.com">emmanuel.sambale@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;">
train mappers FYI:<br>
<a href="http://www.lrta.gov.ph/line1_FareMatrix.htm" target="_blank">http://www.lrta.gov.ph/line1_FareMatrix.htm</a><br>
<br>
--<br>
cheers,<br>
maning<br></blockquote></div><br>
<div style="visibility: hidden; display: inline;" id="avg_ls_inline_popup"></div><style type="text/css">#avg_ls_inline_popup { position:absolute; z-index:9999; padding: 0px 0px; margin-left: 0px; margin-top: 0px; width: 240px; overflow: hidden; word-wrap: break-word; color: black; font-size: 10px; text-align: left; line-height: 13px;}</style>