<div dir="ltr"><div dir="ltr"><div class="gmail_default" style="font-family:georgia,serif"><br></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Sat, May 21, 2022 at 6:51 PM Greg Troxel <<a href="mailto:gdt@lexort.com">gdt@lexort.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><br>
Bill Ricker <<a href="mailto:bill.n1vux@gmail.com" target="_blank">bill.n1vux@gmail.com</a>> writes:<br>
<br>
> MassDOT tweets:<br>
> <a href="https://twitter.com/MassDOT/status/1527788581690941445" rel="noreferrer" target="_blank">https://twitter.com/MassDOT/status/1527788581690941445</a><br>
>> The River Street Bridge in #HydePark will be CLOSED until further notice,<br>
> as of 5/20, for emergency bridge repairs. Road closure and detour will be<br>
> in place. #Boston<br>
><br>
> <a href="https://www.openstreetmap.org/way/141395663" rel="noreferrer" target="_blank">https://www.openstreetmap.org/way/141395663</a><br>
> was last updated 2 months ago, which added surface=paved.<br>
><br>
> It still carries MassDOT import's Tags:<br>
><br>
> attribution= Office of Geographic and Environmental Information (MassGIS)<br>
> bridge= yes<br>
> condition= fair<br>
> highway= tertiary<br>
> lanes= 2<br>
> layer= 1<br>
> massgis:way_id= 204695<br>
> name= River Street<br>
> source= massgis_import_v0.1_20071008193615<br>
> surface= paved<br>
> width= 13.4<br>
><br>
> including *condition=fair* which has obviously been overtaken by events.<br>
> MASSGIS values below fair are  *deficient*, and *intolerable* (per<br>
> <a href="https://wiki.openstreetmap.org/wiki/Key:condition" rel="noreferrer" target="_blank">https://wiki.openstreetmap.org/wiki/Key:condition</a>).<br>
><br>
><br>
> When marking this bridge closed temporariIy for repairs , should we *delete*<br>
> the out of date official condition, a tag that is largely peculiar to<br>
> MassGIS imports, or should we interpolate *intolerable*, presuming that<br>
> value from being closed immediately upon inspection? Or can we find<br>
> official source for current intolerable rating, explocit or implied?<br>
<br>
Given that the import was a really long time ago -- we can use 15 years<br>
for a rough value -- I would expect almost zero correlation between<br>
quality tags then and now, since 20 years is optimistic between<br>
repavings <br>
So I would just delete the condition tags whenever touching an object.<br></blockquote><div><br></div><div style="font-family:georgia,serif" class="gmail_default">Thank you, quite helpful.</div><div style="font-family:georgia,serif" class="gmail_default">An imaginary friend on OHM suggested re the basic closure tagging</div><div style="font-family:georgia,serif" class="gmail_default"><br></div><div style="font-family:georgia,serif" class="gmail_default"><span class="gmail-d2edcug0 gmail-hpfvmrgz gmail-qv66sw1b gmail-c1et5uql gmail-b0tq1wua gmail-a8c37x1j gmail-fe6kdd0r gmail-mau55g9w gmail-c8b282yb gmail-keod5gw0 gmail-nxhoafnm gmail-aigsh9s9 gmail-d9wwppkn gmail-hrzyx87i gmail-gfeo3gy3 gmail-a3bd9o3v gmail-b1v8xokw gmail-oo9gr5id" dir="auto" lang="en"><div class="gmail-kvgmc6g5 gmail-cxmmr5t8 gmail-oygrvhab gmail-hcukyx3x gmail-c1et5uql"><div dir="auto" style="text-align:start">> i would just mark the bridge segment access=no until you got the desirea clarification</div></div></span> <br></div><div style="font-family:georgia,serif" class="gmail_default">to which i replied <br></div><div style="font-family:georgia,serif" class="gmail_default"><br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div style="font-family:georgia,serif;margin-left:40px" class="gmail_default"> that seems reasonable to ME, and I think that's what was done with the Sarah Mildred Long Interstate Bridge (which is itself Interstate, but does not carry an Interstate Highway), but Wiki.osm specifically requests we NOT do that (nor Construction tags) for temporary closures ≤ 6 months,  so i've given it a 6 month closure access:conditional and a NOTE to update when schedule is announced/slips/etc<br><br><a href="https://www.openstreetmap.org/way/141395663">https://www.openstreetmap.org/way/141395663</a><br><a href="https://www.openstreetmap.org/note/3189485">https://www.openstreetmap.org/note/3189485</a><br><br>comments &/or armchair welcome!</div></blockquote></div><br clear="all"><div style="font-family:georgia,serif" class="gmail_default">Since this bridge was apparently already scheduled for a rapid bridge replacement and failed an interim inspection, this may be closure for duration while they expedite building the replacement ... or they may be able to patch it, reopen, build replacement,and swap them ... TBD next week, i guess ? <br></div><br>-- <br><div dir="ltr" class="gmail_signature"><div dir="ltr">Bill Ricker<br><a href="mailto:bill.n1vux@gmail.com" target="_blank">bill.n1vux@gmail.com</a><div><a href="https://www.linkedin.com/in/n1vux" target="_blank">https://www.linkedin.com/in/n1vux</a> <br></div></div></div></div>