[Tagging] Feature Proposal - RFC - 3rd and 4th rail (Michael Reichert)
Paul Allen
pla16021 at gmail.com
Sun Jun 14 11:20:09 UTC 2020
On Sat, 13 Jun 2020 at 17:50, Garry Keenor <garry.keenor at gmail.com> wrote:
> Paul - thanks for the response. I struggle with the idea that someone
> would know that a route is electrified with a ground level contact system,
> but not how many rails there are. The possible sources are a) local
> knowledge,
>
Or local-ish knowledge. On-line newspaper article saying the line has
been electrified (I'm local to me, and I know how to use the internet; the
newspaper is local to the line).
b) wikipedia
>
Never trust wikiepedia. :)
and c) aerial imagery.
>
Sometimes aerial imagery is crappy. Good enough to see that there are
no gantries for carrying an overhead line but not good enough to count
rails. Unlikely, particularly on a long line, but possible.
> All of these will, 9 times out of 10, define the system. Also, there are
> only 2 networks that I can identify worldwide that are 4th rail, and I've
> tagged them both already. :-)
>
So when 8 more networks are converted to 4th rail, there's a risk that one
of
them (using your figures) can't be pinned down. :)
I assume that more networks will be converted over time, or new ones will
be built as 4th rail. Or will they?
--
Paul
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openstreetmap.org/pipermail/tagging/attachments/20200614/33496ac8/attachment.htm>
More information about the Tagging
mailing list