DaveF,
Any examples you wish to share of infrastructure/items not removed which were ultimately abandoned?
Cheers
Andy
-----Original Message-----
From: Dave F [mailto:davefoxfac63 at btinternet.com]
Sent: 29 November 2016 21:48
To: talk-gb at openstreetmap.org
Subject: Re: [Talk-GB] HS2 phase 2a preferred route
I thought it was agreed we weren't mapping pie-in-the-sky proposals.
Primarily because the creator fails to remove them when political will wanes.
Perfect for a Leaflet overlay, though.
DaveF
On 29/11/2016 19:19, Andy Robinson wrote:
> As it happens the Phase 2b shape files are available. Just rather
> buried under an obscure filename.
>
> I'll post again once I've made the route updates for 2b (Manchester &
> Leeds)
>
> Cheers
> Andy
>
> -----Original Message-----
> From: Andy Robinson [mailto:ajrlists at gmail.com]
> Sent: 29 November 2016 16:28
> To: talk-gb
> Subject: HS2 phase 2a preferred route
>
> Folks,
>
> I've just added the Jan 2016 preferred route alignment for HS2 phase
> 2a (West Midlands to Crewe) along with the associated tags, converted
> from the data.gov OGL shapefile to OSM format as per previous HS2
> additions I've undertaken. All ways are also added into a single
> relation for ease of reference/selection.
>
> The upload sits in one changeset
> https://www.openstreetmap.org/changeset/44037689
>
> The uploaded data basically duplicates the consultation alignment
> (with a very slight few meter offset) that was uploaded as the Phase 2
> consultation alignment in 2014. Once the OGL shapefiles are available
> for the now preferred phase 2b (Crewe to Manchester & West Midlands to
> Leeds) I would propose to remove the original Phase 2 2014 data from
> OSM so that the data properly reflects Governments now preferred
> routes and the proper distinction between the three main phases of the
> proposed HS2 (Phase 1, Phase 2a & Phase 2b -West and East). This will
> also eliminate the apparent current data duplication over the Phase 2a
> portion between the West Midlands and Crewe.
>
> The only data that appears to be missing in the Jan 2016 Phase 2a
> shapefile is the proposed HS2 linespeed. I could copy the linespeed
> data from the Phase 2 consultation version though I do not know if it
> would be entirely correct. For now I'll ignore as it can always be
> added from a suitable source later.
>
> Any comments please add them in the changeset comments.
>
> In other rail related updates I made new road layout final changes at
> Norton Bridge WCML upgrades near Eccleshall at the weekend. All works
> are now complete there.
> Also for those near Peterborough the new rail diveunder at Werrington
> has just stared detailed design with the contractor now on board for
> construction.
>
>
> Cheers
> Andy
>
>
>
> _______________________________________________
> Talk-GB mailing list
> Talk-GB at openstreetmap.org
> https://lists.openstreetmap.org/listinfo/talk-gb
---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
_______________________________________________
Talk-GB mailing list
Talk-GB at openstreetmap.org
https://lists.openstreetmap.org/listinfo/talk-gb
More information about the Talk-GB
mailing list