<br>I suggest that any 'temporary' speed limit change that will last more than 6 months could reasonably be tagged in maxspeed. Shorter periods should probably use a maxspeed:temporary or some other suitable overriding tag?<br>
<br>Fyi, I have used 'proposed:maxspeed' to hold the intended new value where signals are being introduced. 'construction:maxspeed' would I guess be appropriate where work has started. I have also used construction:lanes for sections of the M25 where the number of lanes is changing from 3 to 4. Also construction:oneway=no for a section of the A11 which will become a 2-way road when the A11 dualling is complete.<br>
<br>Here are some examples:<br><a href="http://www.openstreetmap.org/browse/way/4546874">http://www.openstreetmap.org/browse/way/4546874</a> (proposed:maxspeed)<br><a href="http://www.openstreetmap.org/browse/way/26295971">http://www.openstreetmap.org/browse/way/26295971</a> (construction:lanes)<br>
<br>If we go with the above speed limit tagging then it might be worth updating the ITO speed limit view to show temporary and planned changes to speed limits.<br><br><br>Regards,<br><br><br>Peter<br><br><br><div class="gmail_quote">
On 29 July 2011 10:27, Kev js1982 <span dir="ltr"><<a href="mailto:osm@kevswindells.eu">osm@kevswindells.eu</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
<p>on the a46 dualling I have been putting the reduced limits in, but here the road is on a new alignment so its for the rest of the life of the road (until is becomes part of ncn route 48 anyway!) . </p>
<p>Shame there's no way AFAIK of tagging fixme:2013-05-01=roadworks due to finish,  resurvey alignment/maxspeed<br>
 and then have openstreet bugs ignore until that date (unless you wish to see them)!</p>
<p></p><blockquote type="cite"><div><div></div><div class="h5">On 29 Jul 2011 10:13, "Brian Prangle" <<a href="mailto:bprangle@gmail.com" target="_blank">bprangle@gmail.com</a>> wrote:<br><br>The  M1 between junctions 11 and 13  is a standard 70 mph  NSL, but until spring 2013 it  is a 50mph average speed camera regulated section during upgrade works. After Spring 2013 it will become maxspeed=signals.  How to tag it?  My preference would be for the 50mph average speed with a note that it ends spring 2013. My guess is that sections rolling from the South will transform from 50 mph to maxspeed=signals, so those of you who travel this section of the M1 should watch out for the big switch on and edit appropriately - it will certainly make life swifter than the current congestion.<div>


<br></div><div>As a general point do routing and travel planner algorithms make use of these long term construction speed restrictions?<br><div><br></div><div>Regards</div><div><br></div><font color="#888888"><div>Brian</div>

</font></div>
<br></div></div>_______________________________________________<br>
Talk-GB mailing list<br>
<a href="mailto:Talk-GB@openstreetmap.org" target="_blank">Talk-GB@openstreetmap.org</a><br>
<a href="http://lists.openstreetmap.org/listinfo/talk-gb" target="_blank">http://lists.openstreetmap.org/listinfo/talk-gb</a><br>
<br></blockquote><p></p>
<br>_______________________________________________<br>
Talk-GB mailing list<br>
<a href="mailto:Talk-GB@openstreetmap.org">Talk-GB@openstreetmap.org</a><br>
<a href="http://lists.openstreetmap.org/listinfo/talk-gb" target="_blank">http://lists.openstreetmap.org/listinfo/talk-gb</a><br>
<br></blockquote></div><br>