[OSM-talk-ie] FYI: N Route re-designations as Motorways

Andrew McCarthy me at andrewmccarthy.ie
Thu Jul 16 16:58:38 BST 2009


On Wed, Jul 15, 2009 at 06:42:18PM +0100, Thomas Bibby wrote:
> > N7: Limerick Bypass section, but how much of it?
> 
> From the roundabout at start of the dual carriageway bypass (junction
> with under construction motorway), to the R511 overbridge (a few
> hundred metres before the N7/N20 interchange roundabout, strangely)
> 
> > N20: Anybody know exactly how much of it?
> 
> The SI [1] says from 660m south of the N7/N20 roundabout, which is
> about mid-way between the roundabout and the first offramp on the N20
> (interestingly enough this offramp got a single blue sign showing the
> exit, none anywhere else on the N20), to where the N20 branches off
> and the N21 goes straight on.

Just a thought, but are these points the official boundary of the
Limerick Tunnel scheme, in particular the new N20/N7 interchange which
is mentioned separately? The 50km/hr temporary speed limit on the N20
northbound starts quite a bit before you see any roadworks, for
instance.

Andrew




More information about the Talk-ie mailing list