[OSM-talk-ie] Waterford Greenway and Athlone-Mullingar

John Ronan jpronans at gmail.com
Tue Apr 18 21:57:28 UTC 2017



On 18/04/17 22:33, Colm Moore wrote:
> Hi,
[bigsnip]
> 
> 
> To a certain degree, the entire routes should be surveyed completely by cycling the routes (a bikecam with adequate memory might be useful, but with stills for specific details) and the details on OSM verified. In particular, the details for connections to local roads and the car parks, play grounds, etc. need mapping. The narrow gauge railway needs its extent verified at the Waterford end and the platforms, buildings.
> 
> 
> Colm

> 
I walked Kilmeaden to Waterford sections in the last week, just to get a
quick look at it all.  I have GPS tracks for both walks.

There appears to be a platform being built at the Waterford end, but it
isn't complete yet.

Its been a while since I looked at JOSM and I'm pretty rusty, but I hope
to do some updating once I get caught up in work. Other than that I'm
happy to answer questions where I can.

Regards
John



More information about the Talk-ie mailing list