[Tagging] Additional detail of Levee mapping via embankments
John Willis
johnw at mac.com
Sat Nov 16 09:21:13 UTC 2019
Still looking for feedback on the idea, Specifically:
- lower base way or area sharing nodes with the top line in embankment / cutting, etc?
- relation or no relation needed?
- map levee with embankment pairs, or map with two pairs of levee specific tags in a relation with the =dyke way?
Javbw
> On Nov 13, 2019, at 8:56 AM, John Willis <johnw at mac.com> wrote:
>
> I think there is a need for a basic relation, if I understand Martin correctly, to simply associate the two lines, (for example, an =embankment and an =embankment_base pair). When mapped, they are not joined. They are merely adjacent. I am not sure of what “type” of relation to choose in iD, but I assume someone will tell us which type to use.
More information about the Tagging
mailing list