[Tagging] track vs footway, cycleway, bridleway or path
Mike Thompson
miketho16 at gmail.com
Wed May 20 18:28:10 UTC 2020
On Wed, May 20, 2020 at 12:09 PM Mike Thompson <miketho16 at gmail.com> wrote:
>
> On Wed, May 20, 2020 at 11:57 AM Joseph Eisenberg
> <joseph.eisenberg at gmail.com> wrote:
> >
> > However, if you are talking about a paved multi-use path, bicycle path or footway which happens to be 3 or 4 meters wide and therefore a police car or emergency vehicle can fit, generally these are still mapped as highway=cycleway or =footway or =path if they are designed and designated for pedestrians or bicycles.
> It is gravel. Rough width is 2.5 meters (I tagged it as such).
>
> > Do you have an example of a particular path or road which is debatable?
> https://www.openstreetmap.org/way/798886886#map=16/40.4656/-105.1320
> I mapped this originally as highway=path, it was changed by another
> user to highway=track. I just changed it back this morning.
Note that this is a brand new trail that just opened to the public
within the last few weeks. Imagery currently available in OSM editing
software will not show the trail as it now exists. There was a track
there previously, and the new trail overlaid parts of it, those that
it didn't overlay are still mapped as "track."
More information about the Tagging
mailing list