[Talk-us] Fixing Alignments in JOSM
Andrew Ayre
andy at britishideas.com
Tue Jun 23 20:35:31 BST 2009
Hi Apollinaris,
They are on the same level. The north-south alignment of the street was
changed at an intersection. Here is a screen shot:
http://files.britishideas.com/public/mapping/staggered.jpg
Andy
Apollinaris Schoell wrote:
> not sure if I understand correct. by staggered do you mean they are on
> different levels via bridges or underpass?
> then there is no need to split. instead
> 1) unglue the node, you will have 2 nodes at exact same location. one
> belongs to way one the other to way 2
> 2) if need to move: both are selected after unglue and will move
> together. you need to select one only. otherwise a move seems like they
> are still joined.
> 3) split ways and add tunnel,bridge,layer tags as needed.
>
> in general split, unglue works like this
> split can be done on any node of a way except start/end
> unglue can be done on any node shared by 2 ways.
--
Andy
PGP Key ID: 0xDC1B5864
More information about the Talk-us
mailing list