[OSM-talk] dev server: the end is nigh!
Raphaël Jacquot
sxpert at sxpert.org
Fri May 4 13:01:32 BST 2007
Frederik Ramm a écrit :
> As I said earlier, I used to run level-7 jobs by analysing the tile
> statistics file and, by comparing the last-modified time stamps of
> level-12 and level-7 tiles, determining which level-7 tiles need an
> update. I don't do that at the moment. The script is in svn
> (tilesAtHome/tools/currency or so) and needs some adaptation to the new
> format of the tile list. Do you think it would be worthwile to revive that?
it would be interesting to have a job list of ready to update level 6
tiles, depending on the uploaded level 12 tiles, similar to the level 12
job list
and then, run level 0 once a day or something
More information about the talk
mailing list