[Rebuild] Logging - post-Rebuild OSMI?
Frederik Ramm
frederik at remote.org
Mon Apr 16 23:14:39 BST 2012
Hi,
On 04/16/2012 11:46 PM, Jørgen Elgaard Larsen wrote:
> I think the simplest approach would be to tag any way that had nodes
> reviewed. A simple
>
> comment:bot=Please review this way, then remove this tag
>
> would do it.
That would mean that all these ways, even if they are ok, would have to
receive at least one further edit (namely removing the tag).
If one assumes that 90% of ways will need to be touched anyway then that
might be an option. If one however assumes that only 10% of ways need to
be touched, then this might create an unnecessary amount of editing
activity!
Bye
Frederik
--
Frederik Ramm ## eMail frederik at remote.org ## N49°00'09" E008°23'33"
More information about the Rebuild
mailing list