[Talk-GB] Maxspeed conundrum
Kev js1982
osm at kevswindells.eu
Fri Jul 29 10:27:04 BST 2011
on the a46 dualling I have been putting the reduced limits in, but here the
road is on a new alignment so its for the rest of the life of the road
(until is becomes part of ncn route 48 anyway!) .
Shame there's no way AFAIK of tagging fixme:2013-05-01=roadworks due to
finish, resurvey alignment/maxspeed
and then have openstreet bugs ignore until that date (unless you wish to see
them)!
On 29 Jul 2011 10:13, "Brian Prangle" <bprangle at gmail.com> wrote:
The M1 between junctions 11 and 13 is a standard 70 mph NSL, but until
spring 2013 it is a 50mph average speed camera regulated section during
upgrade works. After Spring 2013 it will become maxspeed=signals. How to
tag it? My preference would be for the 50mph average speed with a note that
it ends spring 2013. My guess is that sections rolling from the South will
transform from 50 mph to maxspeed=signals, so those of you who travel this
section of the M1 should watch out for the big switch on and edit
appropriately - it will certainly make life swifter than the current
congestion.
As a general point do routing and travel planner algorithms make use of
these long term construction speed restrictions?
Regards
Brian
_______________________________________________
Talk-GB mailing list
Talk-GB at openstreetmap.org
http://lists.openstreetmap.org/listinfo/talk-gb
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openstreetmap.org/pipermail/talk-gb/attachments/20110729/a3b49e62/attachment.html>
More information about the Talk-GB
mailing list